What are the construction steps for the sweat steaming room

2023-08-10 attribution:News

Twitter facebook 未标题-1 linkedin-fill Instagram

  0c2f96ea84365ed

  Sweat steaming is a popular way for many users and friends to maintain health. Setting aside a warm sweat in a sweat steaming room can help people's bodies detoxify to some extent. Therefore, sweat steaming rooms are becoming more and more popular in cities. When choosing a sweat steaming room, you can choose one located near you. However, there are still many things that need to be noted when constructing your own sweat steaming room, So today we will conduct a specific analysis on the construction of the sweat steaming room.

  Suspend the ceiling, keep the top insulated, and install the ceiling cloth. The shapes of the ceiling are diverse, with Korean style sweat steaming rooms often using ceiling cloth, Enron sweat steaming rooms using nano quilts, and there are also other materials used. Korean style sweat steaming rooms can be painted with energy powder on the ceiling or without the ceiling, all painted on the wall, with the same effect. Mix the energy powder and putty powder of the ceiling and hang them on the gypsum board or wooden board of the ceiling. Pay attention to reserving light lines for the suspended ceiling. The ceiling cloth needs to be tightened, and one side can be fixed first, and then the other side can be fixed after tightening.

  Wall bound wooden keel frame. Install the extruded board, embed it in the wooden keel, and keep the wall flat. Install gypsum board on the upper layer of the extruded board. (Gypsum board is used to level the wall and facilitate the fixation of other materials) The wall surface is paved with reflective film and Heating film. The wall surface is paved with Heating film and connected with wires, connected to the temperature controller, and installed with the temperature sensor probe of the temperature controller for power on test. Decorate the wall after confirming that there are no abnormalities. When the probe is not long enough, a copper core wire of the same thickness can be used to extend it. It is recommended to use a telephone signal wire.

  The outer layer of the Heating film is paved with non-woven fabric (non-woven fabric is used to hang energy powder, but not in Enron Nano Sweat Room), bamboo curtains are installed, and marks are made. When driving nails, do not nail them to the heating area of the Heating film and wires. When installing the backrest, do not drive the nail to the heating area of the Heating film and the wire. The construction and paving sequence of the ground Heating film: the first layer: the second layer of the extruded board: the third layer of the reflective film: the electric heating film. If the floor tiles are paved, the Heating film needs to be specially bagged, patented technology. Fourth layer: lay waterproof cloth, overlapping each other by 15CM (if laying floor leather, waterproof cloth can be omitted) Fifth layer: floor, floor tiles, etc. If laying floor tiles, please mix a large bag of high-energy star powder with sand to make 2-3CM thick, and then stick the floor tiles. To lay the floor, energy powder can be directly sprinkled under the floor for use.

Read recommendations:

cold plunge barrel

artesian iris hot tub

best outdoor barrel sauna

red cedar sauna manufacturer

Operation and maintenance methods for sweat steam rooms

Selection of Materials for Household Sauna Rooms

What are the materials for the sweat steaming room that need to be analyzed and inspected

Related Posts