Shenzhen Bropool Industrial Co., Ltd. is a professional manufacturer on sauna room, hot tub and cold plunge
Tel:+86 18928448819 E-mail:info@bropool.com
Home> News> Installation steps and precautions for sweat steaming room.hot tub hydrotherapy benefits>
2023-09-08 attribution:News
1. Choose a suitable installation location. Due to the limitations of the structure and housing environment of the home, it is not possible to find a square and upright room like a commercial one. Generally, household sweat steaming rooms choose idle areas, such as attics, staircases, corners of underground rooms or parts of balconies, as well as renovated bathrooms or cloakrooms. The area should not only consider ventilation and exhaust, but also waterproof isolation. The frequency of use and the division of nearby functional areas should be considered. Generally, household sweat steaming rooms are for use by their own family or relatives and friends, so the location should choose a suitable space for installation.
2. Choose a reasonable circuit layout. Generally, the power of a household sweat steaming room is not very high, usually around 2KW. Ordinary sockets cannot ensure safe electricity use. Generally, we recommend using dedicated lines or air conditioning lines, with at least 4 square meters of dedicated lines reserved at a height of 1.5 in the room. Of course, grounding is essential.
3. If the installation of a household sweat steaming room is purchased as a mobile device, you can assemble it yourself. After unpacking, find the manual, and then splice the base, rear wall panel, left and right wall panels, and stool panels according to the requirements. Connect the heating wires inside the stool panel, install the front panel, cover the top cover, and then connect the plugs in all directions. These are fixed interfaces, some are numbered, find the corresponding connection, some are anti fooling interfaces, and if not, they cannot be plugged in. After all lines and buckles are connected, check again and confirm that there are no errors before plugging in and opening before testing. If the various functions of the operation panel display normally, the assembly is completed and can be used normally. If there is a display fault, find the fault point and troubleshoot it.
4. If customized products are used, only the right style needs to be selected, and construction personnel will be arranged to come to the site to make the rest. Generally, the production time will be based on the selected materials and styles, and it will take about a week to complete. The installation process of a household sweat steaming room does not require much effort. We will strictly follow the style and the company's construction process to make it. You can also conduct random inspections or supervision during the process, and communicate any problems or modifications that need to be made at any time. There is a dedicated person responsible for coordinating with you.
Read recommendations:
Double Infrared Sauna (Model IS-1403)
aleko outdoor indoor barrel sauna.Which wood is suitable for a sauna room?