Shenzhen Bropool Industrial Co., Ltd. is a professional manufacturer on sauna room, hot tub and cold plunge
Tel:+86 18928448819 E-mail:info@bropool.com
2024-06-05 attribution:other news
The walls, ceilings, and doors of the sauna room in the disinfectant swimming pool should be properly insulated. When calculating the power request of the electric heater, approximately 1.2 cubic meters of volume will be added per square meter of uninsulated details.
Proper moisture-proof treatment should be carried out. The policy is to control the entry of damp gas into other rooms or walls. The moisture-proof installation should be installed between the heating insulation layer and the Flat noodles.
The insulation and moisture-proof installation of the swimming pool cleaning sauna room should be installed from the outside to the inside according to the following specifications.
1. The thickness of the wall insulation layer should not be less than 50mm, and the thickness of the ceiling should not be less than 100mm.
2. It is recommended to use cardboard boxes or aluminum foil as the vapor barrier distance layer, installed above the insulating aluminum foil.
3. A 20mm air slot shall be reserved between the vapor barrier distance layer and the external Flat noodles.
4. In order to make the back of the Flat noodles secure the moist gas, a groove should be reserved between the wall Flat noodles and the ceiling.
Read recommendations:
Analyzing the Millennium Traditional Culture of Finnish Sauna