Skip to content

Sauna, Cold Plunge & Hot Tub Manufacturer OEM / ODM

Request a Quote →
Cold Plunge · CT-05 External water-temperature equipment and connections to be selected

All-Stainless Oval Cold Plunge

The CT-05 cold plunge is a low oval cold plunge tub with 304 stainless-steel oval tank with natural stainless exterior finish shown. Working overall dimensions: 1500 × 770 × 600 mm. Working internal dimensions: 1440 × 710 × 550 mm. External water-temperature equipment and connections to be selected. Confirm the approved drawing,…

  • Low oval cold plunge tub
  • Working size: 1500 × 770 × 600 mm
  • Material: 304 stainless-steel oval tank with natural stainless exterior finish shown
Request a configuration quote View specifications

Confirm model, site, utilities, equipment, included items, options, destination, quantity and target timing.

ModelCT-05
Product formatLow oval cold plunge tub
Working overall size1500 × 770 × 600 mm
Material304 stainless-steel oval tank with natural stainless exterior finish shown
Product overview

All-Stainless Oval Cold Plunge

The CT-05 cold plunge gives wholesale, hospitality and project buyers a clear reference for the low oval cold plunge tub. The photographed complete product establishes the visible form; the quotation confirms the selected materials, system, accessories and destination requirements.

Bropool CT-05 cold plunge complete front view
View 01
Key features

What buyers can evaluate from this model.

Start with the complete product form, then verify the selected materials, dimensions, equipment and site interfaces.

Bropool CT-05 cold plunge complete side view

Complete CT-05 cold plunge product view

The lead image shows the complete tub before closer construction, connection or application views.

Bropool CT-05 cold plunge complete side view

Defined material and dimension starting point

The draft separates working comparison dimensions from the final approved drawing and itemized order specification.

Bropool CT-05 cold plunge visible construction detail

RFQ-ready project configuration

Buyers can compare finishes, equipment and OEM needs while keeping unconfirmed items out of the standard supply.

Dimensions & configuration

Compare sizes, materials and configuration choices.

Use the working dimensions for comparison and the approved drawing and technical file for the order.

ModelCT-05
SKUCT-05
ModelCT-05
Product TypeLow oval cold plunge tub
Working Overall Dimensions1500 × 770 × 600 mm
Working Internal Dimensions1440 × 710 × 550 mm
Material Configuration304 stainless-steel oval tank with natural stainless exterior finish shown
System ConfigurationExternal water-temperature equipment and connections to be selected
Available ChoicesThe brochure shows a cover, inlet/outlet and wood-and-metal step/equipment enclosure. Confirm finish, chiller, connections and standard supply.

Confirm the final axis order, water depth, usable volume, access path and connection positions before approval.

Product details

Inspect the construction and user touchpoints.

Use the gallery to review visible construction and interfaces. Hidden functions, ratings and inclusions are confirmed in the model-specific technical file.

Bropool CT-05 cold plunge complete front view
Detail 01

Overall product form

Review the complete vessel, exterior enclosure, entry arrangement and equipment zone visible in the gallery.

Bropool CT-05 cold plunge complete side view
Detail 02

Vessel and exterior construction

Confirm the selected material, finish, thickness and fabrication details against the approved production specification.

Bropool CT-05 cold plunge complete side view
Detail 03

Connections and service access

Use the final interface drawing to plan water, drainage, power, ventilation and maintenance clearance.

Installation, use & care

Confirm the site and utilities before ordering.

Confirm delivery access, finished base, water, drainage, electrical supply, ventilation and service responsibilities before ordering.

Prepare the site

Provide destination, site and access dimensions, finished base conditions, utilities, ambient conditions, expected use and preferred configuration.

Install & commission

Installation and commissioning must follow the approved drawing and manual for the exact configuration and applicable local requirements.

Operate & maintain

Operate, clean and inspect the final product under its approved manual and site sanitation plan. Keep connections, ventilation and service areas accessible.

Pre-order requirement check

AccessCheck complete product dimensions against the delivery path
Site/baseLevel, drained and load-suitable finished base
UtilitiesWater, drainage and electrical supply confirmed for the selected system
ClearanceUse the approved drawing and manual for operating and service clearances
Applications

Evaluate where this product may fit.

Application fit depends on the approved configuration, site, expected use, supervision and maintenance responsibilities.

Bropool CT-05 cold plunge complete front view
01

Oval stainless-steel format

Complete product reference for the low oval stainless-steel tub.

Bropool CT-05 cold plunge complete front view
02

Exterior and step configuration

The complete product view supports review of the vessel, exterior, access arrangement and equipment relationship.

Bropool CT-05 cold plunge complete front view
03

Tank and connection review

This additional product view helps check access, controls, ventilation or service-side clearance before the final drawing is approved.

OEM & project configuration

Turn the selected model into a quotation-ready brief.

After the base model and technical configuration are fixed, Bropool can review finish, branding, controls, accessories, documents and packing for the project.

Items to review with Bropool

  • Exterior and finish reviewConfirm material, finish sample, trim and visual treatment for the selected model.
  • Branding and control presentationReview logo placement and interface presentation after the technical configuration is approved.
  • Documents and packingConfirm destination documents, labeling, manuals and packing requirements for the exact order.

No universal option, minimum quantity, surcharge, lead time, certificate or performance result is promised before model-specific review.

Packaging, documents & delivery

A clear path from configuration to delivery.

Packing, documents, handling and delivery are confirmed after the exact model and configuration are approved.

01. Confirm

Confirm model, destination, quantity, options, site constraints and buyer responsibilities.

02. Document

Review the final drawing, specification, manual, packing list and applicable market documents.

03. Protect

Confirm model-specific packing method, packed dimensions, gross weight and handling points.

04. Deliver

Confirm shipping, unloading and delivery terms for the exact destination.

Product information & review

Built for model selection, configuration review and RFQ.

Bropool maintains this page as the manufacturing and project-supply reference for CT-05. It supports comparison and quotation preparation; the approved quotation and technical file control the final order.

Who maintains it

Bropool

Product identity, supplied photography and quotation-stage information are maintained at company level by Bropool.

How information is checked

Model records + supplied media

Visible claims are based on the current product record and supplied photography. Dimensions, electrical data, inclusions and market requirements remain subject to approved project documents.

Review control

Page checked September 14, 2026

Options, installation conditions, documents, branding and delivery scope are confirmed against the selected model and destination market.

FAQ

Questions to settle before quotation.

Common buyer questions are answered while final technical and commercial scope remains model-specific.

What dimensions are available for the CT-05 cold plunge?

Working overall dimensions are 1500 × 770 × 600 mm; working internal dimensions are 1440 × 710 × 550 mm. Confirm the final axes and production drawing before order.

What materials are specified for this model?

304 stainless-steel oval tank with natural stainless exterior finish shown. Confirm finish samples, construction details and any model-specific substitutions in the quotation.

Is the temperature-control equipment included?

Do not assume inclusion. External water-temperature equipment and connections to be selected. The formal quotation must itemize the equipment, controls, filtration, connections and accessories.

Can Bropool review an OEM or private-label configuration?

Yes. Send the base model, finish, branding, quantity, destination and document requirements for a configuration review. Availability and scope are confirmed for the specific project.

What site information should a buyer provide?

Provide the access route, finished base, water and drainage plan, available electrical supply, ambient conditions, service clearances and expected use.

What should the RFQ include?

Send the model, destination, quantity, target timing, site details, preferred finish, equipment requirements and any branding, document or packing requests.